Dongfeng Tianjin Hook Arm Garbage Truck

Product Details
Customization: Available
After-sales Service: Complete Vehicle
Warranty: a Years
Still deciding? Get samples of US$ 65000/Piece
Request Sample

360° Virtual Tour

Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (20)
  • Dongfeng Tianjin Hook Arm Garbage Truck
  • Dongfeng Tianjin Hook Arm Garbage Truck
  • Dongfeng Tianjin Hook Arm Garbage Truck
  • Dongfeng Tianjin Hook Arm Garbage Truck
  • Dongfeng Tianjin Hook Arm Garbage Truck
  • Dongfeng Tianjin Hook Arm Garbage Truck
Find Similar Products

Basic Info.

Model NO.
CLW5689TYDF5
Certification
ISO9000
Volume
10001-15000L
Emission Standard
Euro 4
Transmission Type
Manual
Payload
20T
Fuel
Diesel
Drive Wheel
4×2
Brand
Dongfeng
Models
Micro
Usage
Hang Barrel Type, Arm Type, Compression Type, Eat Hutch Type
Condition
New
Transport Package
Complete Vehicle
Specification
8300× 2500× 3150
Trademark
CLW
Origin
China
HS Code
4501100000
Production Capacity
1000

Product Description

                           Dongfeng Tianlong hook arm typeDustcart

Produced by our companyHook arm typeDustcartIt is mainly suitable for garbage collection and transfer in municipal sanitation, property management, factory enterprises, street communities, schools, hospitals, rural areas and other places. The hook arm system can be customized according to the user's existing garbage bin..Hook-arm garbage truck is also called a car removable garbage truck,The hook-arm garbage truck adopts a full hydraulic control system, and can be equipped with a hand and electric system.The automatic control system realizes two control modes, which can be used in and outside the cab. It can be used with multiple three-party garbage bins. The garbage bins can be completely separated from the chassis. The hydraulic control system controls the expansion of the hook arm and the locking structure of the locking structure, realizes the lifting and lowering of the garbage bins. It can
Dongfeng Tianjin Hook Arm Garbage Truck
[Main technical parameters]
Product name Car unloadable garbage truck
Total mass (Kg) 25000 Tank volume (m3)  
Rated load mass (Kg) 13570,13505 Outline size (mm) 8300×2500,2550×3150,3190
Preparedness (Kg) 11300 Number of passengers in the cab (person) 2,3
Approach angle/departing angle (°) 20/23 Front suspension/back suspension (mm) 1480/1270,1500/1250
Number of axes 3 Wheelbase (mm) 4350+1350
Axial load (Kg) 7000/18000 (two-axis group) Maximum speed (Km/h) 89
[Technical parameters of chassis]
Chassis model DFH1250D4 Chassis name Cargo vehicle chassis (Class II)
Trademark name Dongfeng brand Production enterprises Dongfeng Commercial Vehicle Co., Ltd.
Outline size (mm) 10270,10355,10705,9650,9605,9720×2500,2530×30753240 Number of tires Ten
Approach angle/departing angle (°) 20/13,20/12,20/28 Tire specifications 295/80R22.5 18PR,11.00R20 18PR
Number of spring pieces of the plate 3/10,3/4,9/10 Front wheelbase (mm) 2010,2040,2070
Type of fuel Diesel oil Rear wheelbase (mm) 1860/1860,1880/1880
Emission standards GB3847-2005, GB17691-2018 VI
Engine model Engine manufacturer. Displacement (ml) Power (Kw)
D6.7NS6B290
DDi75E350-60
DDi75E300-60
 
Dongfeng Cummins Engine Co., Ltd.
Dongfeng Commercial Vehicle Co., Ltd.
Dongfeng Commercial Vehicle Co., Ltd.
 
6700
7500
7500
 
213
257
220
 
Product features:
 High-end appearance
The garbage bin matched by the unloadable garbage truck in the car is a mobile horizontal garbage bin, with four casters and locking devices at the bottom, and a hanging ring at the top, which can be lifted or unloaded from the car body, or used with a mobile compressed garbage station.
 The pull arm hook is installed on the car chassis and is used for lifting, unloading from the garbage bin or dumping garbage. It is mainly composed of hook arm, hook arm frame, auxiliary beam and hydraulic cylinder. The auxiliary beam is mainly used to fix and support the garbage bin with the chassis, and serves as an installation connection frame for other parts.The pull arm and hook arm frame are mainly used for lifting, unloading and dumping garbage bins, and the hydraulic cylinder is the driving part of each action.
 Good sealing performance
The unloadable garbage truck adopts a fully enclosed garbage bin, which effectively avoids secondary pollution and noise pollution during loading and transportation. It is extremely beneficial for environmental protection and is a new type of garbage collection and transportation vehicle.
 Easy to use and easy to operate
 The top cover system can be opened and closed normally in a short period of time, and the loading and unloading process is unafflicated, and all the operation processes of the vehicle can be completed by the driver alone. The vehicle can pull the garbage in the underground garbage bin and the garbage bin together with the truck and can be dumped at the same time, reducing the labor intensity of workers.The garbage truck collection and transportation method is a widely used garbage collection and transportation method in the world. It can achieve multiple boxes of one truck, greatly reducing the cost of equipment and space, etc.
 Multiple choices, customized on demand
According to the user's needs, the detachable sanitation truck sealing cover of the car is designed to be flipped on both sides, folding cover, front sliding cover, fully sealed side opening small doors, and all the rear cover of the garbage truck can be designed to be manually or hydraulically closed.
Operation methods and steps:

Hook box operation:
1. Drive the vehicle to about 2.5 meters in front of the garbage bin, and try to be in a straight line between the vehicle and the trunk.
2. Hydraulic pump force: Start the engine, step down the clutch, pull up the handle of the force collector, and slowly release the clutch.
 3. Rotate the "off/power/on" knob of the control box to the "on" position, and then the buzzer of the control box sounds to indicate that the control power supply is turned on.
 4. Rotate the "Lock/Reld" knob to the "Reld" position for 5-8 seconds, and the big arm hook is in the fully released position. Release your hand and no longer rotate the knob.
5. Rotate the "ext/hook arm/shrunk" knob to the "ext" position. At this time, the main cylinder is stretched and maintain this operation until the main arm hook flips slightly lower to the center of the dustbin hook, let go, and no longer rotate the knob.
6. Close the force collector: Step down the clutch, press the handle of the force collector down, and release the clutch.
7. Hang the vehicle in reverse gear and drive backward until the arm is hooked to the center of the dustbin.
 8. Take the force of the hydraulic pump again and rotate the "extched/hook arm/shrank" spinWhen the button is in the "shrunk" position, the main cylinder is shortened, and this operation is maintained until the garbage bin is pulled onto the vehicle; when hooking the box, ensure that the track of the trunk enters the middle of the two guide wheels of the pull arm hook, such as deviating from the middle of the guide wheel, the position and angle of
9. Rotate the "Lock/Relde" knob to the "Lock" position for 58 seconds, until the arm lock hook is in the fully locked position, release the hand and no longer rotate the knob.
  1. Turn off the force, the power knob of the control box, and the hook box action is completed.

Self-unloading operation:
  1. Drive the vehicle to the place where the garbage is dumped, observe the situation of the ground, and require the ground to be flat, strong, and unloading-free.
  2. Open the back door of the dustbin.
3. Rotate the "off/power/on" knob of the control box to the "on" position, and the buzzer of the control box sounds to indicate that the power supply is turned on.
4. Hydraulic pump force.
5. Rotate the "Lock/Relde" knob to the "Lock" position for 5-8 seconds, until the upper arm lock hook is in the fully locked position, let go and no longer rotate the knob. Make sure that the upper arm lock hook is in a fully locked position.
6. Rotate the "exting/hook/shrunk" knob to the "ext" position. At this time, the main cylinder is stretched, and the bin is lifted along with the lift and the main arm. Keep this operation until the bin is fully lifted and the garbage in the bin is completely dumped clean.
7. Rotate the "extand/hook arm/shrunk" knob to the "shrunk" position, at which time the main cylinder is shortened, and the garbage bin is slowly withdrawn with the lift and main arm. Keep this operation until the garbage bin is completely withdrawn and placed on the vehicle. Stop rotating the knob.
8. Turn off the power taker, turn off the power knob of the control box, and close the back door of the car box. The dump operation is completed.

Unboxing operation:
The process of unloading the box operation is contrary to the hook box operation process. It is to place the garbage bin from the vehicle on the ground. The point is that before unloading the box operation, the big arm lock hook should be completely released.
1. Before unloading the box, observe whether the unloading position is sufficient, and the ground should be flat and strong.
2. Hydraulic pump force; rotate the "off/power/on" knob of the control box to the "on" position.
3. Rotate the "Lock/Relde" knob to the "Relde" position for 5-8 seconds. The arm hook is in the completely loose position. Release your hand and no longer rotate the knob. Make sure that the big arm lock hook is in a completely loose position.
4. Rotate the "extrement/hook arm/shrunk" knob to the "ext" position. At this time, the main cylinder is elongated and the garbage bin moves with the main arm.Keep this operation until the bin is completely on the ground and release the knob.
5. Drive the vehicle forward about 0.5-1 meters.
6. Rotate "Ext/Hook arm/shrunk knob to the "shrunk" position. At this time, the main cylinder is shortened and the main arm is withdrawn. Keep this operation until the main arm is completely withdrawn and the knob is released.
7. Turn off the power collector, turn off the power knob of the control box, and complete the unloading operation.

Precation:
 1. Before loading garbage, the sleeve-arm garbage truck runs without load to  6  Only when there is a standard can you hang the force taker (bottom left of the steering wheel in the cab) to check for leakage or abnormality of each component, and then follow the position indicated by the operation sign. Under normal circumstances, do not adjust the pressure of the pressure regulating valve, the vehicle has been adjusted before leaving the factory.
2. The weight of the garbage in the garbage compartment should not exceed the range allowed by the vehicle, otherwise it will cause excessive pressure and damage to the hydraulic components when packing. Light cases will cause oil leakage, slipping of the clutch wheels, and seriously cause the clutch to burn to death.
 3. Before the unloading garbage truck, make sure that the longitudinal beam of the compartment is between the rollers at the rear of the secondary beam, and that the longitudinal center axis of the vehicle coincides with the longitudinal center axis of the compartment. Otherwise, the position of the vehicle should be adjusted.
 4.  When loading the garbage bin, the removable garbage truck can appropriately increase the throttle according to the weight of the garbage collected in the car, so that the garbage bin can be smoothly raised and packed.
 5. At the end of the operation, the electromagnetic clutch switch should be turned off in time to ensure that the electromagnetic clutch is out of power. In particular, it is important to remind that when the car is out of the engine, the electromagnetic clutch should be cut off, otherwise it will cause a large amount of battery power consumption, resulting in power loss and the vehicle unable to start normally.

Maintenance and maintenance:
1. A good cleaning of the arm cart is a prerequisite for the maintenance and maintenance of the arm cart.
2. Before using the pull-arm car for the first time and regularly inject lithium-based lubricating oil into each lubrication point (must be carried out weekly - times).
3. Regularly check the liquid level height of the hydraulic tank before workMake sure that the hydraulic oil surface of the oil tank is in the middle of the oil tank observation window, and add an appropriate amount of hydraulic oil in time when it is too small.
4. Replace the corresponding labeled hydraulic oil according to the climate at the right time. Use No. 46 anti-wear hydraulic oil in season and No. 32 anti-wear hydraulic oil in winter.
5. Clean the oil return filter element of the hydraulic tank every six months. If the filter element is damaged, it should be replaced in time.
6. Please refer to the maintenance manual for chassis information.
 
After-sales service commitment
1 Technical training program SupplyThe cargo side is responsible for training the equipment users at the user's location free of charge before handing over the vehicle to the user, mainly to be familiar with the basic principles of such vehicles and the ability to deal with general faults in terms of how to operate the hydraulic system and special devices.
2 After-sales service method The repair of the chassis part can be solved at the service station of the chassis manufacturer closest to the user's use. Distribution location, technical force, contact information, please refer to the Chassis Maintenance Manual. For the maintenance of the special device part, you can use the contact information by phone or fax. We will provide a solution within 2 hours after receiving the user's call, and if necessary, we will send professional maintenance personnel to the site to solve it within 24-48 hours.
3 Free repair plan The "three guarantees" period of the equipment provided by the supplier is one year or 30,000km. During the "three guarantees" period, the free repair of the chassis part is carried out at the Dongfeng Automobile Technical Service Station where the user is located, and the free repair of the special device part is carried out by the supplier sending professional technicians to the door. In case of quality failure caused by illegal operation or improper use, accidents, man-made damage, etc., the supplier shall provide timely maintenance services, and the cost of maintenance shall be borne by the user.
4
Supply and price of accessories after the free repair period
After the free repair period (after the "three guarantees" period), if the equipment fails, it needs to be replacedParts, the chassis part can be carried out at the chassis manufacturer's service station, the special device part is supplied directly by us, and the price of accessories is supplied to the user at cost price, and the maintenance period is lifetime.
5 Agree to do something If you purchase our special car, implement the "three guarantees" period for one year or drive 30,000km, lifelong maintenance, and 24-48 hours after-sales service.
6 Service purpose and objectives Fast, decisive, accurate, thorough and thorough; the quality of service wins user satisfaction.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier